Result of the first MAS LA module were presented on the 6th of November 2015. The presentation included a brief introduction of what had been learnt during the four weeks of the module and a brief introduction to the final design task of the module.
The hypothetical design task was to work with the debris from the upcoming widening of the Gubrist Tunnel to create a landscape intervention along the shores of Zurich lake. Students were asked to develop their designs and to present their project with a model, a panel, a short movie and a presentation.
Tutor: James Yeo